For a project in the maritime sector, Move Industries handled the installation of multiple control motors on board a ship. The work took place in a cramped engine room, requiring precise positioning and safe working methods.
Using compact lifting equipment, the engines were placed on the designated foundations. During the work, consideration was given to, among other things, the existing ship's structure, limited movement space and maintaining stability.